Crnogorski elektroprenosni sistem (CGES) is part of a consortium participating in the implementation of a project in the field…
CGES participation in the Trinity project The TRINITY project (increasing regional border capacity of transmission system by means of intelligent…
Within the investment project NDC120 - Purchase and implementation of ERP and DMS system, a Contract no. 10991 of 9…
About the project Duration: 2017 - 2024 Budget: €24.5 million funded by the European Union through…
Project: Reconstruction-extension of SS Mojkovac included: 1. Reconstruction of SS Mojkovac- forming basbar system and equipping two line bays, one transformer…
The Trans-Balkan corridor is a set of elements of the 400 kV electricity transmission network, which should allow better energy…
The project of construction of SS 400/110/35 kV Lastva includes the construction of 2x300 MVA substation and extension of the…
The 400 kV OHL Lastva-Čevo project includes the construction of two 2x400 kV and 400 kV transmission lines about 35…
The 400 kV OHL Čevo – Pljevlja project includes the construction of the 400 kV transmission line section from Čevo…